Methodology

From geotechnical investigation to certified handover

Every project follows our structured 5-phase engineering protocol, ensuring code compliance, structural longevity, and zero budget surprises.

Phase 01
Est: 1 - 2 Weeks

Geotechnical Investigation & Site Topography

Detailed borehole soil investigation, standard penetration tests (SPT), and Matamuhuri alluvial soil bearing capacity analysis to establish reliable foundation parameters.

Verified deliverables:
Field borehole drilling (SPT up to 20-30m depth)
Laboratory testing: grain size, liquid limit, unconfined compression
Total station topographical contour mapping & flood level check
Official soil test evaluation report with safe bearing capacity recommendations
Phase 02
Est: 2 - 3 Weeks

Structural Modeling & BNBC 2020 Compliance

3D finite element structural analysis using ETABS and SAFE. Formulating ductile frame detailing to resist Zone 3 seismic vibrations and 260 km/h coastal cyclonic wind pressures.

Verified deliverables:
3D building frame mathematical modeling in ETABS
BNBC 2020 seismic coefficient & wind pressure application
Foundation system design (mat, isolated, or cast-in-situ piles)
Preparation of bar bending schedule (BBS) and detailed structural drawing set
Phase 03
Est: 1 - 2 Weeks

Itemized BOQ & Accurate Cost Forecasting

Itemized Bill of Quantities (BOQ) with mathematically calculated material takeoffs and real-time market material rates for Chakaria and Chattogram.

Verified deliverables:
Rebar schedule calculations (BSRM/AKS 500W grade tonnage)
Volume takeoff for concrete, cement bags, Sylhet sand, and crushed stone
Chakaria Pourashava / local vendor procurement rate benchmarking
Milestone-based expenditure roadmap to prevent cash-flow bottlenecks
Phase 04
Est: Project Dependent

Site Execution & Resident QA/QC Oversight

Hands-on civil construction execution or independent client supervision. Enforcing strict cylinder crushing tests, formwork plumbness, and cover block standards.

Verified deliverables:
Daily on-site engineering supervision and milestone reporting
Concrete slump monitoring & 7/14/28-day cylinder crushing strength tests
Rebar placement, lap length, and beam-column joint tie spacing inspection
Curing regimen supervision and structural pre-pour sign-offs
Phase 05
Est: 1 Week

Structural Health Audit, As-Built & Handover

Final comprehensive engineering inspection, as-built drawing preparation, structural fitness certification, and official project handover.

Verified deliverables:
Final structural alignment, plumbness, and deflection audit
Compilation of all material test laboratory certificates
Preparation of comprehensive As-Built drawing set
Formal structural safety clearance handover to client
Quality assurance protocol

Material testing and laboratory verification

We never assume material strengths: we verify every batch through certified laboratory testing.

01 // Concrete testing

7, 14 and 28-day cylinder crushing

Standard 150mm x 300mm cylinders are sampled during every major pour. Tested in calibrated compression machines to ensure concrete reaches specified 25-35 MPa compressive design strength.

02 // Rebar verification

500W grade tensile and bend tests

Verification of prime BSRM/AKS 500W steel bars for minimum 500 MPa yield strength, elongation percentages, and 180-degree cold bend test to guarantee ductile seismic response.

03 // Non-destructive audit

Rebound hammer and ultrasonic testing

For existing buildings and retrofitting evaluations, we employ Schmidt rebound hammers and ultrasonic pulse velocity (UPV) to detect internal honeycombing and structural concrete uniformity.

Schedule Phase 01 site and soil investigation

Start your project on solid ground. Contact our Chakaria team to schedule a field site visit and soil borehole drilling.